The US Navy has taken delivery of the next generation landing craft, ship to shore connector (SSC), Landing Craft, Air Cushion (LCAC) 105.

The LCAC 105 handover followed the US Navy Board of Inspection and Survey-led acceptance trials of the craft.

The trials were performed to assess the readiness and performance of the LCAC 105, as well as to validate the requirements.

Program Executive Office (PEO) Ships Amphibious Assault and Connectors Programs programme manager captain Jason Grabelle said: “LCACs are a critical tool for the Navy, the Marine Corps, and all of our warfighters.

“This delivery comes at an important time for the fleet, and their inclusion will only strengthen our posture.”

According to the US Navy, the SSCs are replacement for the existing fleet of LCAC vehicles with the service. They are built with similar configurations, dimensions, and clearances to the legacy LCACs.

How well do you really know your competitors?

Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.

Company Profile – free sample

Thank you!

Your download email will arrive shortly

Not ready to buy yet? Download a free sample

We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form

By GlobalData
Visit our Privacy Policy for more information about our services, how we may use, process and share your personal data, including information of your rights in respect of your personal data and how you can unsubscribe from future marketing communications. Our services are intended for corporate subscribers and you warrant that the email address submitted is your corporate email address.

The high-speed, fully amphibious landing craft can transport personnel, cargo, weapon systems and equipment to the beach through any environmental conditions. LCACs have a payload capacity of 60t-75t.

The latest LCACs are 100% compatible with the deck-equipped amphibious vessels, as well as the Expeditionary Sea Base and the Expeditionary Transfer Docks.

Currently, LCACs 107-115 are in different stages of production at Textron Systems in Slidell, Louisiana.

In November last year, the US Navy accepted the delivery of LCAC 106 from the company.

The company received a $386m contract in 2020 for the construction of LCACs 109 through 123

The SSC programme calls for the procurement of 72 craft and one test and training craft.