Fincantieri and Leonardo have signed an amendment with European defence procurement organisation OCCAR covering a third Logistic Support Ship (LSS) for the Italian Navy.

The newly signed agreement carries a total value of approximately €500m ($549m), which includes around €88m in options.

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

Under the terms of the contract, Fincantieri’s portion amounts to about €414m, while Leonardo’s share is roughly €85m.

Construction of the third LSS will take place entirely at Fincantieri’s Castellammare di Stabia facility, with delivery scheduled by 2030.

The contract formalising the order was signed at Fincantieri’s Muggiano Integrated Shipyard by OCCAR director Joachim Sucker and Eugenio Santagata, general manager of Fincantieri’s Naval Vessels Division.

Delivery of the LSS programme is managed by the Temporary Grouping of Companies (RTI), headed by Fincantieri and including Leonardo.

Designed to support a broad range of naval operations, these vessels bolster the Italian Navy’s logistics capabilities across its fleet.

The new ship will measure approximately 193m in length, feature a beam of 24m, and have a displacement of about 27,500t. It is expected to reach a maximum speed of around 20 knots.

Systems fitted to the ship will include the SADOC5 Combat Management System, enhanced network protection, and expanded satellite communications capabilities.

These changes are intended to support the coordination of maritime operations, according to Fincantieri.

Fincantieri NexTech will contribute automation systems and cybersecurity infrastructure. The group’s Mechanical Systems and Components Hub will supply equipment including shaft lines, steering gear, bow thrusters, stabilising fins, and other handling systems.

Fincantieri CEO and managing director Pierroberto Folgiero said: “The new LSS strengthens an industrial path that builds on the wealth of expertise developed over time at the Castellammare di Stabia shipyard, which continues to contribute to the Group’s ability to build technologically advanced naval vessels.”

The third vessel will join the Vulcano and Atlante, the first two ships in the LSS series, which were delivered to the Italian Navy in March 2021 and December 2025 as part of Italy’s multi-year naval renewal initiative, known as the Naval Law.

The Italian LSS platform has also been selected by the French Navy under the FLOTLOG programme, which involves constructing vessels based on the Italian design in partnership with Fincantieri’s Castellammare di Stabia shipyard.