Juan Carlos I Landing Helicopter Dock, Spain

Email-Icon
 
Print-Icon
 
Link-to-us
 
Related Projects
key facts
Key Data
Builder
Navantia
Ship Design
2005
Launch
March 2008
Commissioning Date
December 2009
Cost of Ship
Approximately €360m
Length
230.8m
Displacement
27,075t

Landing helicopter dock (LHD) Juan Carlos I, the Spanish Navy's biggest vessel, was launched in March 2008 at Navantia Ferrol Shipyard. Named after the King of Spain, the strategic projection ship has been built at an approximate cost of €360m.

The ship was designed in 2005 and is scheduled to be commissioned in December 2009. At present the ship is being prepared for sea trials.

The LHD has four decks – a dock and garage for heavy cargo, a habitability deck, a hangar and light cargo garage and a flight deck with a portside 12° sky-jump. The ship is equipped with four 20mm guns and four 12.7mm machine guns. An nti-missile close-in weapon system is planned to be included in future.

The LHD is a multi-purpose vessel that can be used as an aircraft carrier as well as for amphibious and relief operations.

Aircraft, amphibious and relief operations

As an aircraft carrier, Juan Carlos I has a 201.9m-long and 32m-wide flight deck with a 12° sky-jump facility for VSTOL aircraft (AV-8B Plus or Joint Strike Fighter). Apart from V-22 Osprey, AV-8B Plus, and JSF aircraft, six NH-90, six SH-3D and six AB 212 helicopters, four CH-47 Chinook and one SA spot can be operated from the vessel.

"The ship was designed in 2005 and is scheduled to be commissioned in December 2009."

The hangar can accommodate 12 aircraft, while six aircraft can be parked on the flight deck. The ship will have two elevators, with a capacity to carry bigger aircraft in the future. The vessel's displacement for air operations is 24,660t and maximum sustained speed is 21kt.

The ship has a dock of 69.3m length and 16.8m width. Her flooding deck can carry four LCM-1E/LCM-8 + 4/6 SUPERCAT type RIBs, one LCAC and LVTs. Displacement of the LHD for amphibious operations is 27,079t, while the maximum sustained speed is 19.5kt.

Juan Carlos I is capable of transporting 144 containers as well as evacuated civilians. It has two operation theatres, a dentist's room, a sick bay, a consulting room, a first aid room, an ICU, an injury selection area, an X-ray room, a lab and a chemist's room. An elevator connects the dock, flight deck and cargo decks to the hospital to transport invalid personnel.

The Spanish Navy will deploy the vessel jointly with the Army. The LHD has a 1,400m² heavy vehicle garage for M-60 or Leopard type tanks. The light vehicles garage is next to the aircraft hangar, in an area of up to 2,046m².

Communications systems

The vessel has satellite, data and voice communication systems in place. The crew and the defence staff on board will be able to receive commands and communication from data links. Information can be received and sent through sensors and equipment.

The combat system has capabilities to share data with the combat systems of other units by integrating the information.

Propulsion

"The LHD is a multi-purpose vessel that can be used as an aircraft carrier as well as for amphibious and relief operations."

The LHD runs on an electric propulsion system. The electric engines are powered by one gas turbine and two diesel generators. It has an endurance of 9,000NM at 15kt. An electric propulsion system means a reduction in fuel consumption, gas emissions and noise and vibrations; lower maintenance costs; reduction of necessary space and high manoeuvrability.

Two POD-type propellers of 11MW each support the system. Similar propellers are in use in aircraft-carrier Príncipe de Asturias and the FFG frigates. Incidentally, Príncipe de Asturias is the first Spanish ship with gas turbine propulsion.

Other Navantia contracts

Apart from Juan Carlos I, Navantia will supply a combat supplier ship, Cantabria, to the Spanish Navy. Cantabria was launched in July 2008. The ship builder is working on two LHDs, similar to Juan Carlos I, for the Australian Navy.

Navantia has three shipyards in Spain – Fene-Ferrol, Cartagena and San Fernando-Puerto Real Shipyard. Juan Carlos I was built at Fene-Ferrol.



Expand Image Expand Image
Strategic projection ship Juan Carlos I is the Spanish Navy's biggest vessel.



Expand Image Expand Image
The ship can be used as an aircraft carrier and amphibious or relief operations: it can store at least 18 aircraft and transport civilians.



Expand Image Expand Image
As well as Juan Carlos 1, Navantia is also supplying a combat ship to the Spanish Navy.



Post to:
Delicious  
Digg  
reddit  
Facebook  
StumbleUpon  

Suppliers
EIDSkyDec

Newsletter Sign-Up
For all the latest news in the defence industry, sign up here

Home
New On This Site
Products & Services
Company A-Z
Industry Projects
Features & Commentary
White Papers
Jobs & Careers
Industry News
Gallery
Events & Exhibitions
Newsletter Sign-Up
Advertise With Us
About Us
Client Area


RSS What is RSS
The website for the defence industries - navy